Leave Your Message
WENK Pneumatic ML Series Multi Connector
Products
Products Categories
Featured Products

WENK Pneumatic ML Series Multi Connector

The ML Series Multi Connector by WENK Pneumatic is a high-quality manifold block designed for efficient air distribution in pneumatic systems. This compact, blue-anodized aluminum connector features multiple ports for simultaneous connection of several air lines, streamlining installation and reducing potential leak points. Available in various configurations with 5, 6, 7, 8, or 9 holes, the ML Series provides flexible solutions for diverse pneumatic applications.

Engineered for reliability, this multi-connector operates with compressed air as the working medium and maintains optimal performance within a temperature range of -20°C to 80°C. Its robust aluminum alloy construction ensures durability while remaining lightweight, making it ideal for use in industrial automation, manufacturing equipment, and various pneumatic control systems where efficient air distribution is essential.

    Product Detail

    Working Media

    Cleaned Air

    Working Pressure

    0~0.9Mpa(0~0.92kgf/cm²)

    Proof Pressure

    1.32Mpa(13.5kgf/cm²)

    Working Temperature Range

    0℃~60℃

    Body Material

    Aluminum Alloy

    ML Series Multi Connector User Guide

    ML(1)

    Product Introduction

    The ML Series Multi Connector is a high-quality pneumatic distribution component manufactured by WENK Pneumatic. Made from premium aluminum alloy with a blue anodized finish, it offers excellent corrosion resistance and durability. The compact design allows for simultaneous connection of multiple air lines, effectively reducing installation space and potential leak points. Available in various configurations with 5, 6, 7, 8, or 9 ports, it is suitable for air distribution in various pneumatic systems.

    ML(2)

    Installation Instructions

    1. Preparation

      • Ensure the working environment is clean, free of dust and impurities
      • Check the connector for damage and ensure its specifications match the system requirements
      • Prepare necessary tools and air hoses
    2. Installation Steps

      • Clean the connector surface and connection parts with a clean cloth
      • Select an appropriate installation location based on system requirements
      • Connect the main air supply to the inlet port
      • Insert each branch air hose into the corresponding outlet ports
      • Secure the air hoses with clamps or ties to prevent them from loosening due to vibration
    3. Installation Notes

      • Ensure all connection points are properly sealed to avoid leaks
      • Avoid excessive force during installation to prevent damage to the connector or hoses
      • Ensure the system pressure is within the rated working pressure range of the connector
      • After installation, perform a system test to check for any leaks

    ML(3)

    Usage and Maintenance

    1. Daily Use

      • Regularly check if all connection points are secure and free from leaks
      • Monitor system pressure for stability
      • Avoid subjecting the connector to severe impact or twisting
      • Keep the connector surface clean to prevent accumulation of dust and impurities
    2. Maintenance

      • Regularly clean the connector surface to remove dust and oil
      • Check if the air hoses are aged or damaged, replace if necessary
      • When not in use for a long period, it is recommended to disconnect the air supply and store properly
      • If corrosion is found on the connector surface, handle it promptly

    ML(4)

    Troubleshooting

    1. Leakage Issues

      • Check if the air hoses are properly inserted into the ports
      • Confirm if the air hoses are aged or damaged, replace if necessary
      • Check if the connector has any cracks or damage
    2. Pressure Instability

      • Check if the main air supply pressure is stable
      • Confirm if the connector specifications match the system flow requirements
      • Check if there are any kinks or blockages in the air hoses
    3. Loose Connections

      • Reinsert the air hoses and ensure they are securely connected
      • Use additional clamps or ties for reinforcement
      • Check if the ports are worn, replace the connector if necessary

    ML(5)

    Safety Precautions

    1. Please read this guide carefully before installation and use
    2. Ensure the system pressure does not exceed the maximum working pressure of the connector
    3. Avoid standing directly in front of the connector during operation to prevent injury in case of sudden disconnection
    4. Avoid contact of the connector with corrosive substances
    5. If the connector is found to be damaged or abnormal, please stop using it immediately and replace it
    6. Regularly check all connection points to ensure safe operation of the system

    ML多管路接头_01

    Our Commitments & Core Advantages

    1. We are a factory specializing in the production of pneumatic components, with mature manufacturing experience and technology.
    2. We manufacture and supply a wide range of series and specifications of air cylinders and pneumatic components, providing you with flexible options.
    3. We can undertake the customization business of various pneumatic components according to the specific needs of customers.
    We adhere to the service concept of efficiency and thoughtfulness, making you feel comfortable throughout the cooperation process, just as smooth as cooperating with a close friend.

    Make an free consultant

    Your Name*

    Phone Number

    Country

    Remarks*

    reset