WENK Pneumatic QTYH High Pressure Regulator
Product Detail
Working Media |
Cleaned Air |
Working Pressure |
0.1~3.0Mpa |
Proof Pressure |
4Mpa |
Working Temperature Range |
5℃~60℃ |
Body Material |
Aluminum Alloy |
QTYH Series High Pressure Regulator - User Guide

Product Overview
The QTYH series high pressure regulator is a high-performance pneumatic component designed specifically for high-pressure pneumatic systems. It precisely adjusts input high-pressure gas to the required low-pressure output and maintains stable output pressure despite fluctuations in input pressure and flow rate. Featuring a spring diaphragm structure, it provides both pressure reduction and stabilization functions, making it suitable for various industrial high-pressure pneumatic systems.
Technical Parameters:
- Type: Spring diaphragm high pressure regulator
- Working medium: Compressed air
- Maximum input pressure: 4.0 MPa
- Output pressure range: 0.05-3.5 MPa
- Operating temperature: -5-80°C
- Connection thread: G1/4" to G1" (depending on model)
- Model specifications: QTYH-08 (G1/4"), QTYH-10 (G3/8"), QTYH-15 (G1/2"), QTYH-20 (G3/4"), QTYH-25 (G1")
- Features: High-precision pressure control, aluminum alloy construction, built-in pressure gauge, secondary venting function, high-pressure resistant design

Installation Steps
1. Pre-installation Preparation
- Ensure the compressed air system is shut off and depressurized
- Clean connecting pipes to remove foreign objects and impurities
- Prepare necessary tools: wrench, PTFE tape, etc.
- Inspect the pressure regulator for damage and confirm the model meets system requirements
2. Installation Position and Sequence
- Installation sequence: In a pneumatic system, the pressure regulator should be installed after the filter
- Installation position: Should be installed as vertically as possible (handle facing up or down)
- Installation direction: Must be installed according to the "IN" (inlet) and "OUT" (outlet) markings on the valve body
3. Pipe Connection
- Use PTFE tape for thread sealing (note: do not allow PTFE tape to enter the pipe interior)
- Tighten connections evenly with a wrench, avoiding excessive force that may damage threads
- Ensure all connections are secure and tight without leakage
- Leave 1.5-2 thread widths at the pipe end, do not over-tighten
4. Mounting Installation
- For larger models (QTYH-20 and above), it is recommended to use a dedicated bracket for fixation
- Ensure secure installation to avoid vibration effects
- Leave sufficient space for operation and maintenance
5. Post-installation Check
- Ensure all connections are secure without looseness
- Confirm airflow direction matches the markings
- Check if the installation position meets requirements
- Verify that the pressure gauge is clearly visible

Operation Guide
1. Initial Pressure Setting
-
Pressure adjustment method:
- Rotate the adjustment handle counterclockwise to the loosest position (minimum pressure)
- Slowly open the air supply and observe the pressure gauge reading
- Rotate the adjustment handle clockwise to adjust the pressure to the desired value
- After adjustment, the handle can remain in the current position
-
Precautions:
- Adjust slowly to avoid sudden pressure increases
- The set pressure should not exceed system requirements
- The set pressure should not exceed the regulator's maximum adjustment range
- Input pressure must be at least 0.1MPa higher than output pressure
2. Pressure Adjustment Operation
- Increase pressure: Rotate the adjustment handle clockwise
- Decrease pressure: Rotate the adjustment handle counterclockwise
- Pressure monitoring: Real-time monitoring of output pressure via built-in pressure gauge
3. Operation Check
- After starting the system, observe the operation of the pressure regulator
- Check if the output pressure is stable at the set value
- Inspect all connections for leaks
- Confirm the secondary venting function is normal (gas should be exhausted when reducing pressure)

Maintenance
1. Daily Inspection
- Regularly check if the output pressure is stable
- Verify if the pressure gauge reading is accurate
- Inspect all connections for leaks
- Keep the valve body clean, avoiding dust and debris accumulation
2. Periodic Maintenance
-
Cleaning and maintenance:
- Shut off the air supply and release system pressure
- Disassemble the pressure regulator (if necessary)
- Clean the exterior of the valve body with compressed air
- Inspect the condition of diaphragms and seals
- Reinstall and test
-
Maintenance cycle:
- Daily inspection: Once a week
- Cleaning maintenance: Once every 3 months
- Seal replacement: Once every 12 months or as needed
- Comprehensive inspection: Once every 12 months
3. Troubleshooting
-
Unstable output pressure:
- Check if the input pressure is stable
- Inspect if the diaphragm is damaged
- Check if the valve seat has impurities
- Inspect if the adjustment spring is fatigued
-
Unable to reach set pressure:
- Check if the input pressure is sufficient
- Verify if the adjustment range matches requirements
- Check if the valve port is blocked
- Inspect if the diaphragm is damaged
-
Pressure leakage:
- Check if connections are tight
- Inspect if seals are damaged
- Check if the valve body has cracks
- Inspect if the pressure gauge interface is leaking

Precautions
1. Safety Precautions
- Always shut off the air supply and release pressure before installation and maintenance
- Do not exceed the maximum working pressure of 4.0MPa
- Avoid use in high-temperature environments (temperature not exceeding 80°C)
- Do not strike or scratch the valve body with sharp objects
2. Usage Limitations
- For compressed air systems only
- Not suitable for corrosive gas environments
- Avoid direct sunlight and strong vibration
- Not for use with oxygen or other flammable and explosive gases
3. Repair and Replacement
- Use original accessories for maintenance
- Follow product manual guidelines for seal replacement
- If valve body damage is found, immediately stop use and replace
- Conduct pressure testing after maintenance to ensure safety

Frequently Asked Questions
Q1: Where should the QTYH high pressure regulator be installed in a pneumatic system?
A1: It should be installed after the filter, near the pneumatic components requiring stable pressure, preferably in a vertical position.
Q2: How to determine if the pressure regulator is working properly?
A2: After starting the system, observe if the pressure gauge reading remains stable at the set value and if the pressure adjustment responds sensitively.
Q3: Can the QTYH regulator be adjusted while the system is running?
A3: Yes, the QTYH series regulator is designed to allow pressure adjustment during system operation.
Q4: What is the maximum input pressure of the QTYH regulator?
A4: The QTYH series regulator has a maximum input pressure of 4.0MPa and an output pressure range of 0.05-3.5MPa.
Q5: What may cause unstable output pressure of the regulator?
A5: Possible causes include: input pressure fluctuations, damaged diaphragm, impurities on the valve seat, or fatigued adjustment spring.